The first day of remodeling. I stayed up until 5:00am clearing out the kitchen. The cabinets were delivered at 7:30am. Ouch! Basically all that happens this day is the cabinets are delivered, unpacked and checked to make sure all the ordered parts are there and undamaged. If anything is missing or broken, it has to be reordered, and the whole project gets set back ten days or so. Thankfully, everything turned out to be all there and intact.
The cleared out eating area. | Empty kitchen. The window is actually visible now. |
Side and basement doors, dishwasher and refrigerator. | The wall opening into the living room. |
The soon-to-be-demolished half wall, and a very confused kitty. (Where did everything go?) | The cabinet delivery truck, driving away. |
Many boxes containing cabinets. | A different view of the pile of cabinet boxes. |
The big box contains the pantry. | Unpacking the boxes. This cabinet will go next to the refrigerator. |
This is one of the upper cabinets. | This is the corner cabinet that will hang over the sink. |
Now we have a pile of cabinets. | The unpacked pantry. |
<---The Remodeling Plans Day Two--->