The first day of remodeling. I stayed up until 5:00am clearing out the kitchen. The cabinets were delivered at 7:30am. Ouch! Basically all that happens this day is the cabinets are delivered, unpacked and checked to make sure all the ordered parts are there and undamaged. If anything is missing or broken, it has to be reordered, and the whole project gets set back ten days or so. Thankfully, everything turned out to be all there and intact.

The cleared out eating area. Empty kitchen. The window is actually visible now.
Empty eating area Empty kitchen
   
Side and basement doors, dishwasher and refrigerator. The wall opening into the living room.
Doors, dishwasher, fridge Wall opening
   
The soon-to-be-demolished half wall, and a very confused kitty. (Where did everything go?) The cabinet delivery truck, driving away.
Confused cat KSI truck
   
Many boxes containing cabinets. A different view of the pile of cabinet boxes.
Cabinet boxes More cabinet boxes
   
The big box contains the pantry. Unpacking the boxes. This cabinet will go next to the refrigerator.
Still more cabinet boxes 4 drawer cabinet
   
This is one of the upper cabinets. This is the corner cabinet that will hang over the sink.
Upper cabinet Upper corner glass cabinet
   
Now we have a pile of cabinets. The unpacked pantry.
Pile of cabinets Pantry cabinet

<---The Remodeling Plans     Day Two--->