| Construction Diary | |||||||||
2003: |
|||||||||
2004: |
|||||||||
2005: |
|||||||||
2006: |
|||||||||
2007: |
|||||||||
2008: |
|||||||||
| References | Technical Notes | Egrets and the Commodore | |||||||
Rollover Part 3: All the way over, and raise the hull 18 inches above the ground
1) In halfway position . . .
2) get a new purchase on the sheer clamp . . .
3) . . . and flop onto its bottom.
4) Nearly flush to the ground. . .
5) we start to jack it up . . .
6) high enough to clear the cradle.
| Rollover Steps | |||
All images and text Copyright Dale Austin, 1962-2008
