August 2007
Lofting the crowns onto cardboard.
The cardboard mock-up.
Checking the fit.
Testing the alignment of the ridge line.
August 6
The electrical system is mostly in. I'll be able to test it from charger to masthead before the week is out.
August 13
The batteries are charged, and the electrical system tested. Still have to order and install cabin lighting. The storage locker in the bow is painted, as well as the trim in the cabin.
I started a cardboard mock-up of a cockpit tent for beach camping and storage. It's my good luck there is a boat canvas guy just about two miles from my door.
August 23
I lost a few days work time to preparedness activities for Hurricane Dean
August 27
Interior paint work is well along. I'm back onto the centerboard, and just about ready to finish the rudder.