the all-seeingeye Pangur Ban: 28' Sharpie
Construction Diary

2003:

July 4 - 13

July 16 - 20

July 21 - 27

July 28 - Aug. 3

August 4 - 22

August 23 - 31

September

October

November
December

2004:

March

April

May

June

July

August

Rollover

September

October November

December

2005:

February

March

April

May

June-August

September

October

2006:

March

July-August

September

October

2007:

April-May

June

July

August

September

October

2008:

January

February

May

July

September

References Technical Notes Egrets and the Commodore

November-December, 2003

Adding new, square, plumb walls to an ancient house is a treat. The space between the floor and ceiling is exactly 96 inches along these walls, but the floor and ceiling curve almost an inch in 8 feet . . .

November and December have been way too cold to work outside, so I've been up to some work on the inside of the house. I'm adding some closet space and some more bookshelves. If you've looked at the plans for the McAllaster House, this is the room between the master bedroom and the first floor full bath.

Should be back to the boat in March.

Construction Diary

2003:

July 4 - 13

July 16 - 20

July 21 - 27

July 28 - Aug. 3

August 4 - 22

August 23 - 31

September

October

November
December

2004:

March

April

May

June

July

August

Rollover

September

October November

December

2005:

February

March

April

May

June-August

September

October

2006:

March

July-August

September

October

2007:

April-May

June

July

August

September

October

2008:

January

February

May

July

September

References Technical Notes Egrets and the Commodore