E906/SeaQuest Target picture gallery


Click on the small pictures to see them in full size.

A view of the coldhead and condensor during fabrication in Lorenzon's lab at U-M.
The cryotargets during assembly in Lab F at Fermilab, with Richard Raymond in the picture.
During the early stages of installation in NM4 Hall. One target is mounted on the target table just in front of FMAG and the beamd dump.
One of the targets outside the target enclosure together with pump stands.
A view of the cryotargets installed in the target enclosure, connected to all the cables, hoses and instruments. They are sitting on the target table such that the Deuterium target is exposed to the 120 GeV proton beam from the Main Injector.
A view of the cryotargets installed in the target enclosure, connected to all the cables, hoses and instruments. The target table is moved to the Hydrogen target position.
A picture taken of a fully assembled target flask that was exposed to about 5x the working pressure. The bloating of the 50-am long flask is clearly visible.
A screen shot of the target status slow control window.
A schematic of the target table layout. It contains the liquid hydrogen and deuterium targets, and well as the solid iron (Fe), carbon (C) and tungsten (W) target positions.
A cooldown test whith liquid hydrogen that shows the pressure and temperature of the target as a funnction of time.

Last update: August 31, 2012 , Comments to Wolfgang Lorenzon