The electrician scheduled for today was postponed by a day, but lots of stuff got done anyway. More cabinets were hung/installed, the plumbing was moved, the wall and floor where the demolished walls were attached were patched, as was the wall around the plumbing, and the trim was pulled off the wall opening in preparation for filling in the part that will be covered by the pantry.

The wall opening, with some of the trim removed. The plumbing for the sink, moved to its new location.
   
Leveling the bottom corner cabinets. Now the doors and drawer are installed.
   
Hanging the cabinet next to the refrigerator opening. The lower cabinet by the big window is now in place.
   
My contractors. Hanging the cabinet that will be over the refrigerator.
   
Lining up the pantry. The repaired area where the half wall used to be.

<---Day Three     Day Five--->