Wednesday, March 29, 2006

all of our LED rope light was delivered this week, and we started building our invasive species light network today.





Thursday, March 23, 2006

this week has been lasercutting week for our acrylic shrines.













each house has 5 acrylic pieces. for 200 houses, thats 1000 pieces of acrylic we cut this week.
whew.


Monday, March 20, 2006

whaddya mean this might be dangerous?



we got one of our solar panels to power a tv and dvd player today for our prairie installation.



the tv is AC power, but is actually fewer watts (53) than a more expensive DC with a smaller screen.
the solar batteries hold 12v, but only run 5 ampers - and the entire load takes 5 ampers per hour to run. so we're trying to see how long it would take for one solar panel to charge five rechargeable batteries.

Sunday, March 19, 2006

this weekend we began fabrication of the 200 shrines which will go in the peony garden.
steps 1 & 2 - cut acrylic sheets on the woodshop table saw. then sandblast to achieve that milky white appearance.




































Friday, March 17, 2006

Matt Coolidge from The Center for Land Use Interpretation was a visiting artist at U of M's School of Art and Design this week. He had some great advice and feedback about our project, from super excitement over the invasive species network to suggestions about how we could submerge our units for the prairie installation (rubbermaid trash cans).
Thanks Matt!
www.clui.org

Wednesday, March 15, 2006

It's official, our site is up!

Please visit us at www.digitalkami.org.

Friday, March 10, 2006

Notes from mtg March 9:
site ambassadors:
inv species: russ
prairie: carrie
shrine: mike
huron river: tao

we will meet at 9 on sunday at the grad studios (perhaps we can go out to the arb with the led's from there???)
look at the orig and new acrilic houses and decide on dimensions - then tao will figure out the best way to consolidate then when we laser cut acrilic sheets (sheets are 4'x8')
tao will contact the sensor rental contact to see if we can get the sensor more than a week before we open the installation
mike will order led's from the link carrie emailed and according to the #'s we discussed this am